MMSProject52-20

MMSProject52-20

What was I thinking?

This week we had temperatures ranging from 100 degrees down to 78. It rained so hard one morning that it was as dark as night. The rains have really helped the flowers flourish. Like these rabbits, enjoying the delight of being in the midst of color, I have enjoyed the break from the sun and being “stuck” inside. LOL…being stuck inside is something I never think about because I’m too busy in thought and soul painting. I even paint in my dreams while I sleep!

Sculpture by David Iles, Bolivar, HOP Rabbits, bronze.